How it works
Four steps to a set house.
Modular is not a different kind of house. It is the same house, built to the same codes. Most of it just happens under a roof.
Step 1
Pick a plan
Start from a floor plan that fits your lot and the way you live.
Ranches, capes, and two stories. We will tell you honestly which ones work on the ground you have and which ones do not.

Step 2
Spec it out
Change the layout, the finishes, and the details until it is your house.
Move a wall, add a bath, stretch the great room, put the primary suite on the first floor. This is where most of the decisions get made.
Design yours
Step 3
Built at the factory
Your home goes into production and most of it is built indoors at the factory.
Framing, wiring, plumbing, insulation, drywall, cabinets, even flooring and trim. Most of the house is finished under a roof and inspected as it goes.
Step 4
Delivered and set
The home is trucked to your lot and craned onto its foundation. The set crew joins the sections, raises the roof and seals it up.
Set day is the one everybody takes pictures of: a crane, a crew, and your house going up on its foundation.
What comes next
Every lot is a little different.
Permits, site work, foundation, utilities, and finish work all depend on the ground you own and how much you want to take on yourself. We can handle as much of it as you want, from the footings and foundation to the plumbing, HVAC, and masonry. Or we deliver and set the house, and your own builder takes it from there. Call us and we will walk through your lot together.