How it works

Four steps to a set house.

Modular is not a different kind of house. It is the same house, built under a roof, so a rainy month does not push your move-in date.

Step 1

Pick a plan

Start from a floor plan that fits your lot and the way you live.

Ranches, capes, and two stories. We will tell you honestly which ones work on the ground you have and which ones do not.

Step 1: pick a plan

Step 2

Spec it out

Change the layout, the finishes, and the details until it is your house.

Move a wall, add a bath, stretch the great room, put the primary suite on the first floor. This is where most of the decisions get made.

Step 2: spec it out

Step 3

Built at the factory

Your home goes into production and is built indoors, typically in six to eight weeks.

Framing, wiring, plumbing, insulation, drywall, cabinets. All of it happens under a roof, inspected as it goes.

Step 3: built at the factory

Step 4

Delivered and set

The home is trucked to your lot and craned onto its foundation, usually in a single day.

Set day is the one everybody takes pictures of. The house goes from a foundation to a home between breakfast and dinner.

Step 4: delivered and set

What comes next

Every lot is a little different.

Permits, site work, foundation, utilities, and finish work all depend on the ground you own and what you want to take on yourself. The fastest way to get a straight answer is to call us and walk through it.